804-244-6737 Get My Free Estimate

How a bathroom remodel works, step by step

A bathroom remodel starts with a visit and a written price, then moves from demo to waterproofing, tile and the final walkthrough. Here is how it goes with Bencke’s Tile in Richmond, VA.

Call for Remodeling Service:804-244-6737
White subway tile shower with a stone bench and a patterned mosaic floor

How a project runs.

  1. Free in-home estimate

    We come to your home, measure, and talk through what you want.

  2. Your price

    You get the price for your job before any work starts.

  3. The build

    Demo, prep, tile and grout, in that order.

  4. Walkthrough

    You look over the finished room before the job is closed.

Inside a remodel

What happens in a typical bathroom remodel

  • The old room comes out

    Fixtures, old tile and anything that cannot stay are removed.

  • The bones get checked

    Walls, floor and pipes are looked at before anything new goes in. This is when a hidden problem shows up.

  • Backing and waterproofing

    Flat, firm boards go on, and the wet areas get a waterproof layer.

  • Tile goes up

    Walls first, then the floor, with the layout planned so cuts land where you will not notice them.

  • Grout and sealing

    Joints are filled, then cleaned and finished.

  • Fixtures and finishing

    Vanity, mirror, fixtures and trim go back in.

  • The walkthrough

    You look over the finished room with the crew before the job is called done.

When plans change

Why a bathroom job sometimes takes longer than the first guess

A wall can hide an old leak. A floor can turn out to be uneven. Tile can arrive late. None of that is unusual, and none of it should be a surprise on the bill.

The best way to avoid surprises is to ask. At the free estimate, ask what the crew will check first and how changes are handled.

Frequently asked questions

Don’t see your question? Call or write and we will answer it.

It varies with the size of the room and the amount of rebuilding. Ask about the schedule for your job at the free estimate.

Yes. The tile has to be on site before the tile work starts, so choosing early keeps the job moving.

Start with step one: a free estimate.

Call Get My Free Estimate