804-244-6737 Get My Free Estimate

Tub to Shower Conversion in Hanover County, VA

Bencke’s Tile converts tubs to tiled showers in Hanover County, VA. The estimate is free, and we come to your home to look at the alcove and measure.

Call for Remodeling Service:804-244-6737

Get your free estimate

1What are we working on?

Step 1 of 2 · We call you back to book the visit.

Glass-enclosed shower with a tiled tub deck
The houses

In Hanover County, one home in three is older than 1980

  • 1991Median year built
  • 32.2%Built before 1980
  • 44,589Homes counted
  • 16.1Miles to Richmond, straight line

The Census survey for 2020 to 2024 gives Hanover County a median build year of 1991, give or take two years. Of 44,589 homes, 32.2 percent, about 14,400, were built before 1980. A further 18.9 percent date from before 1970.

That is a big base of older bathrooms, and some still have the tub they came with. The 1990s are the largest decade, at 20.5 percent, so many tubs are about thirty years old. Either way, the new shower usually takes the same alcove, and the wall behind it is checked before tile.

Homes by decade built

  • 1939 or earlier4.1%
  • 1940s2.2%
  • 1950s4.2%
  • 1960s8.3%
  • 1970s13.4%
  • 1980s16.6%
  • 1990sMedian20.5%
  • 2000s15.8%
  • 2010s12.2%
  • 2020 or later2.8%

U.S. Census Bureau, American Community Survey 2020 to 2024, 5-year estimates. Distance is a straight line from the center of the place to Richmond.

Hanover County notes

Hanover County: the asbestos certificate and other checks

  • The 1985 line

    Hanover asks for an asbestos certificate with the permit application when the work is on a building put up before January 1, 1985. About a third of the county’s homes are older than 1980.

  • A big county

    Hanover County includes Mechanicsville and the town of Ashland. On our service-area map the county seat is about 16 miles from the Richmond point in a straight line.

  • No water number to quote

    The Hanover water reports we read do not list hardness. A test strip from a hardware store gives a reading for your own tap and helps you pick glass and fixtures.

  • Four in five own

    The Census counts 82.1 percent of occupied Hanover homes as owner-occupied, so most conversions are the household’s own call.

Tiled showers to hold against your own

Navy tile shower and marble-look floor in a bathroom
Shower
White subway tile shower with a stone bench and a patterned mosaic floor
Shower
Glass-enclosed shower with a tiled tub deck
Shower
Wood-look tile shower with two niches and a mosaic band
Shower
Shower with a black and white penny tile floor border
Shower
Marble-look tile shower with a hexagon floor and a lit niche
Shower
Marble-look tile shower with a mosaic niche
Shower
Marble-look tile shower with a wood-look accent strip and a pebble floor
Shower
Navy tile shower and a marble-look tile bathroom floor
Shower
Tiled shower with a mosaic band and a pebble shower floor
Shower
Bathroom with a double vanity and a gray tile floor
Floor
Slate-blue tile wall above a bathtub
Shower
See all projects
Permits and who to call

Hanover’s Building Inspector’s Office

Hanover County Building Inspector's Office (Building Inspections)

7516 County Complex Road, Hanover, VA 23069

Hanover County’s Building Inspector’s Office is at 7516 County Complex Road. The pages we read do not list when a permit is needed or exempt, so a drain change like a tub to shower swap is a question for the office.

They do require an asbestos certificate for renovation, demolition and reroofing work on structures built before January 1, 1985.

Official page
Marble-look tile shower with a hexagon floor and a lit niche
Behind the tile

What’s behind the tile decides if it lasts.

A shower can look perfect on day one and leak in year three. What stops that is the work you never see.

  1. 01 / 06

    Grout

    Fills the joints

  2. 02 / 06

    Tile

    The surface you pick

  3. 03 / 06

    Thinset

    Bonds the tile to the wall

  4. 04 / 06

    Waterproof membrane

    Keeps water in the shower

    Skip it and water soaks the wall behind the tile

    A rushed job skips this layer

  5. 05 / 06

    Cement board

    Flat, firm backing

    Drywall swells when it gets wet; cement board does not

    A rushed job skips this layer

  6. 06 / 06

    Wall framing

    Studs and plates

How the wall gets built

Water reaches the wall

  • Tile set straight on drywall
  • No waterproofing test
  • Cut pieces wherever the wall ends
  • Cement board behind every wet wall
  • Waterproof membrane, flood-tested before tile
  • Layout planned so the cuts land where you won’t see them
Get My Free Estimate

How a project runs.

  1. Free in-home estimate

    We come to your home, measure, and talk through what you want.

  2. Your price

    You get the price for your job before any work starts.

  3. The build

    Demo, prep, tile and grout, in that order.

  4. Walkthrough

    You look over the finished room before the job is closed.

Where we work.

Our main areas are Henrico, Chesterfield and Mechanicsville. We also work in Richmond and the counties around it.

Pins mark city centers, not addresses. Map data: U.S. Census Bureau and OpenStreetMap contributors.

5.0 on Google from 16 reviews.

Google rating

16 Google reviews

Bencke’s Tile Bathroom Remodel

Read all reviews on Google
Janna K.Bathroom remodel

We had such a great experience working with Gabriel and his team at Bencke’s Tile Bath Remodel. From the very beginning, Gabriel was incredibly communicative, responsive, responsible, and someone we felt we could completely trust. He always kept us updated, answered every question, and made what could have been a stressful renovation feel easy.

Our Jack-and-Jill bathroom was 25 years old and very builder-grade and felt cramped with way too many doors. Gabriel helped completely transform the space into a bathroom that feels so much larger, brighter, and honestly looks like something out of a magazine.

The quality of the work is exceptional. They waterproofed the bathroom properly, insulated the tub, installed a linear drain with a perfectly sloped floor so the water drains exactly where it should, and the tile work is absolutely flawless. The floating vanity, mirror, and every finish were installed with so much attention to detail.

What I appreciated just as much was that Gabriel truly stands behind his work. If we noticed even the smallest thing, he was happy to come back and make it right without any hesitation. It’s rare to find a contractor who genuinely wants everything to be perfect.

We interviewed several contractors before choosing Gabriel, and I am so glad we did. The final result exceeded our expectations, and the whole process was smooth from start to finish. I wouldn’t hesitate to recommend Gabriel and his team to anyone looking for a bathroom remodel. They do beautiful work, they’re honest, and they’re the kind of people you actually enjoy working with. Adding the before and after pictures for reference!

Brock C.Tile bathtub access panel

We needed an access panel for our tile bathtub and Gabriel was able to give us a quick estimate. He delivered flawlessly and we are very happy!

Frequently asked questions

Don’t see your question? Call or write and we will answer it.

The county asks for an asbestos certificate with the permit application for buildings put up before January 1, 1985. Call the Building Inspector’s Office about your own house.

Hanover County is on our list of places we serve, and the estimate is free at your home. Tell us your street and we will confirm.

We found none in the water reports we read. Use a test strip on your own tap.

The walls can be tiled to the height you pick, up to the ceiling. Someone talks it through at the free estimate.

Ask for a free estimate on your Hanover tub.

Call Get My Free Estimate